الباص السريع
Project Info
Client:
أمانة عمان الكبرى
Consultant:
أمانة عمان الكبرى
Contractor:
شركة حدادين الهندسية للمقاولات
The Bus Rapid Transit System (BRT) is a transportation project designed to connect Sweileh circle with the previously constructed BRT lane.
ACWA Power is developing a new 485 MW (net) gas-fired Combined Cycle Gas Turbine (CCGT) power plant, known as the 'ACWA Power Zarqa CCGT Project'.
DCP’S High-performance steel fibers with hooked ends for concrete reinforcement under the name “ST Fiber Type I“ were used to enhance the slab’s mechanical properties and reduce plastic shrinkage cracking and crack propagation.